Ground Works

Project New Builds

6 two bed flats and 2 four bed houses .

Project under way !!  always excited to see ground works under way but also  nervous at the same time as always the unknow when excavating never knowing whats ahead , all as gone well and ready for the concrete pour, and knowing from experience once poured it brings a calm, good feeling, knowing we can  move onto the next stage of bringing up to damp course, Build on !!

 

Concrete Pour

Yes concrete poured !! 14 six meter lorries, all ready mix pumped from road side first lorry arrived at 8.30am last lorry 15.30pm , pump lorry and ready mix all cleaned up and gone by 17.00pm big relief for all and a well deserved cold beer .  Quotemygoods held the day firmly in their hands and liaised with readymix company keeping them up to date with lorry turn arounds , phew !!