Ground Works

Project New Builds 6 two bed flats and 2 four bed houses . Project under way !!  always excited to see ground works under way but also  nervous at the same time as always the unknow when exca...

Concrete Pour

Yes concrete poured !! 14 six meter lorries, all ready mix pumped from road side first lorry arrived at 8.30am last lorry 15.30pm , pump lorry and ready mix all cleaned up and gone by 17.00pm big r...

Pump Lorry

Not a lot of room to spare but drivers of the day held their nerv and made the day run smooth a big thank you to the men of the hour , now to cure and onto the next stage